AL-Khafji Joint Operations(KJO)
Friday, July 30, 2010  

 KJO E-Mail           

  KJO E-mail

 

 EMS Policy

  Latest News
Certificate of Appreciation
  Search
Advanced Search

Presentations

Code Presenter Organization Title
Keynote-1 David Christmas Schlumberger Why Do You Need a Step Change in Quality?
Keynote-2 James Hall Shell Exploration & Production Break-Through Technologies in Gas Lift: Challenges, Learnings and Solutions
Keynote-3 Roman Molotkov Weatherford International  ESP Monitoring and Diagnosis Enables Operational Efficiency
ALTEM-1 Mohammad Al-Khaldi  KJO ESP Pilot Project In AL-Khafji Field
ALTEM-2 Ahmed R. Al-Zahran Saudi Aramco Lessons Learned from the First Saudi Aramco Offshore Field Fully Operated with ESP 
ALTEM-3 Paul Docherty  Schlumberger Gas Lift New Technology
ALTEM-4 Bernie Fay Baker Hughes Partnering to Improve ESP Run Live
ALTEM-5 El-Sayed Ouda Ghoniem KJO Gas Lift Optimization Study in Al-Khafji Field 
ALTEM-6 Magdy M. Kirolos ALKhorayef Petroleum Artificial Lifting Systems Hybrid or Combined Technologies 
ALTEM-7 Mark K. Rooks Saudi Aramco ESP’s and Smart Well Completions KHRS-506
ALTEM-8 Bandar A. Al-Shammari KJO Making the ESP Infrastructure for KJO Offshore Fields
ALTEM-9 David P. Davidson Petrotech Inc., USA Artificial Lift ESP type Horizontal Surface Pumping Systems
ALTEM-10 Fahad Al-Yami Saudi Aramco BEST PRACTICES IMPLEMENTATION FOR BEST ESP INSTALLATION RESULT 
ALTEM-11 JEFFREY HAGAN ALKhorayef Petroleum HORIZONTAL PUMPING SYSTEMS
ALTEM-12 Andy Limanowka Canadian Advanced ESP Inc Advanced Monitoring Technology
ALTEM-13 Julian Cudmore Zenith Oil Field Technology LTD New technology for improving and Simplifying ESP Data Management 
ALTEM-14 Henry Alexande Saudi Aramco BRRI-28 Bottom Discharge pump for inter-zonal injection 
ALTEM-15 Khalid Albasri ALKhorayef Petroleum ENHANCED VARIABLE SPEED DRIVE IMPROVES ESP SYSTEMS
ALTEM-16 Mohammad Al-Khaldi  KJO Production Optimization for Khafji Field Using Advance software tool
ALTEM-17 Sheldon Jahn ALKhorayef Petroleum Fast Track Implementation of Cold Heavy Oil with Sand Project in the Middle East
ALTEM-18 David P. Davidson Petrotech Inc., USA Artificial Lift ESP Thrust Design Reliability & Run Time Performace
ALTEM-19 Mohamed El Kaliouby Schlumberger Increase in return on ivestment utilizing Schlumberger REDA Maximus ESP plug and play system
ALTEM-20 Alan Himes JPTS Gas Lift Jet Pump
ALTEM-21 Paul Docherty  Schlumberger Sinewave VSD Solutions
ALTEM-22 Abdulatif Solan  ALKhorayef Petroleum Implementing ESP downhole Sensor, Y-tools, AFV & POD Technology in Oilfield Applications 
ALTEM-23 Andy Limanowka Canadian Advanced ESP Inc Variable Frequency Generator