| Code |
Presenter |
Organization |
Title |
| Keynote-1 |
David Christmas |
Schlumberger |
Why Do You Need a Step Change in Quality? |
| Keynote-2 |
James Hall |
Shell Exploration & Production |
Break-Through Technologies in Gas Lift: Challenges, Learnings and Solutions |
| Keynote-3 |
Roman Molotkov |
Weatherford International |
ESP Monitoring and Diagnosis Enables Operational Efficiency |
| ALTEM-1 |
Mohammad Al-Khaldi |
KJO |
ESP Pilot Project In AL-Khafji Field |
| ALTEM-2 |
Ahmed R. Al-Zahran |
Saudi Aramco |
Lessons Learned from the First Saudi Aramco Offshore Field Fully Operated with ESP |
| ALTEM-3 |
Paul Docherty |
Schlumberger |
Gas Lift New Technology |
| ALTEM-4 |
Bernie Fay |
Baker Hughes |
Partnering to Improve ESP Run Live |
| ALTEM-5 |
El-Sayed Ouda Ghoniem |
KJO |
Gas Lift Optimization Study in Al-Khafji Field |
| ALTEM-6 |
Magdy M. Kirolos |
ALKhorayef Petroleum |
Artificial Lifting Systems Hybrid or Combined Technologies |
| ALTEM-7 |
Mark K. Rooks |
Saudi Aramco |
ESP’s and Smart Well Completions KHRS-506 |
| ALTEM-8 |
Bandar A. Al-Shammari |
KJO |
Making the ESP Infrastructure for KJO Offshore Fields |
| ALTEM-9 |
David P. Davidson |
Petrotech Inc., USA |
Artificial Lift ESP type Horizontal Surface Pumping Systems |
| ALTEM-10 |
Fahad Al-Yami |
Saudi Aramco |
BEST PRACTICES IMPLEMENTATION FOR BEST ESP INSTALLATION RESULT |
| ALTEM-11 |
JEFFREY HAGAN |
ALKhorayef Petroleum |
HORIZONTAL PUMPING SYSTEMS |
| ALTEM-12 |
Andy Limanowka |
Canadian Advanced ESP Inc |
Advanced Monitoring Technology |
| ALTEM-13 |
Julian Cudmore |
Zenith Oil Field Technology LTD |
New technology for improving and Simplifying ESP Data Management |
| ALTEM-14 |
Henry Alexande |
Saudi Aramco |
BRRI-28 Bottom Discharge pump for inter-zonal injection |
| ALTEM-15 |
Khalid Albasri |
ALKhorayef Petroleum |
ENHANCED VARIABLE SPEED DRIVE IMPROVES ESP SYSTEMS |
| ALTEM-16 |
Mohammad Al-Khaldi |
KJO |
Production Optimization for Khafji Field Using Advance software tool |
| ALTEM-17 |
Sheldon Jahn |
ALKhorayef Petroleum |
Fast Track Implementation of Cold Heavy Oil with Sand Project in the Middle East |
| ALTEM-18 |
David P. Davidson |
Petrotech Inc., USA |
Artificial Lift ESP Thrust Design Reliability & Run Time Performace |
| ALTEM-19 |
Mohamed El Kaliouby |
Schlumberger |
Increase in return on ivestment utilizing Schlumberger REDA Maximus ESP plug and play system |
| ALTEM-20 |
Alan Himes |
JPTS |
Gas Lift Jet Pump |
| ALTEM-21 |
Paul Docherty |
Schlumberger |
Sinewave VSD Solutions |
| ALTEM-22 |
Abdulatif Solan |
ALKhorayef Petroleum |
Implementing ESP downhole Sensor, Y-tools, AFV & POD Technology in Oilfield Applications |
| ALTEM-23 |
Andy Limanowka |
Canadian Advanced ESP Inc |
Variable Frequency Generator |