AL-Khafji Joint Operations(KJO)
Friday, July 30, 2010  

 KJO E-Mail           

  KJO E-mail

 

 EMS Policy

  Latest News
Certificate of Appreciation
  Search
Advanced Search

Waste

The Waste Engineering Division of the EMD is responsibe for KJO's waste management strategy:Waste

Waste Engineering Division

Wastewater Unit:

  • Consult on the design and performance of industrial and sanitary wastewater systems.
  • Review the designs submitted by contractors for new wastewater treatment plants
  • Research and Consult on special issues relating to wastewater treatment.
  • Participate in the environmental regulations especially related to wastewater.
  • Prepare PME wastewater discharge reports
  • Participate in Environmental Impact Assessments of new facilities or major modifications.
  • Participate in environmental performance assessment of operating facilities.
  • Participate in Environmental Audits.

Solid Waste Unit:

  • Consult on waste design and waste management issues.
  • Advise on the handling, treatment, and disposal of solid, liquid, hazardous and toxic wastes.
  • Reviews engineering design packages including land use documents.
  • Performs waste minimization assessments
  • Participate in Environmental Impact Assessments of new facilities or major modifications.
  • Participate in environmental performance assessment of operating facilities.
  • Evaluates and pre-qualified waste management contractors, and monitors both company and contract waste management facilities.

Environmental Lab Unit

  • Conduct routine lab analysis for waste water, solid wastes and hazardous as wastes per government requirements.
  • Provide lab support to ensure that waste water and waste management facilities are in good operational condition and in compliance with government regulation.
  • Provide Lab Support for Special studies on environmental field.