Facts & Figures

Project Achievements

New power Plant

A new power plant with all related facilities including three units of gas turbine generator (30MW each) two  (2) turbine buildings, control room with DCS, 19.B kv switchgear with building, emergency generator, SWGH #1A, cable tunnel, super high stage fuel, Gas Compressor with building, Two (2) diesel oil storage tanks, utility systems, and maintenance shop building are under construction.

40KV Submarine Cable and GIS

The project includes engineering, procurement and construction of a new 40KV power transmission system.  The major facilities involved are a  42 km submarine cable (40 kV, 20 MVA, three (3) cores) inclusive of a build-in -fiber optic cables, two (2) 40 kv Substations comprising of Gas insulated Switchgear (GIS) one each at onshore and offshore and an offshore platform, namely Utility Platform (UTP).

Replacement of Offshore Electrical Equipment

This Project will provide the replacement of various offshore electrical equipment, which has been utilized for more than 30 years and being superannuated, on Flow Stations (Y-1, Y-2, Y-3 & Y4).  Pump Platform, Ratawi Gathering Station, Living Quartar, Offshore Control Platform Ex-loading Dock and valves Station.  New Switchgear Rooms will be installed set each platform to accommodate all electrical systems.

Construction of No. 2 Gas Lift Station

This project will provide four Gas turbine compressors with conditioning skid.  TEG gas dehydration system and related facilities in order to supply enough capacity of gas lift for all planned gas lift wells and onshore fuel gas.

Gas Lift Station no.2

Installation of Gas Supply Facilities from Offshore

This project will provide 12’ Fuel Gas submarine pipeline from gas lift platform to onshore, Onshore gas receiving facilities, and Onshore gas line to Khafji Separators area in order to cover the shortage of Fuel Gas to be utilized for New Power Plant and other facilities at Onshore.

Modification of Offshore Control system

This project intends to replace the tie-worm offshore SCADA system with DCS for the Gathering platform and Flow Stations.  DCS will communicate with PMCR and HCR Onshore.  This existing field instrumentation will be modernized by replacing numeric instruments by electronic instruments and by refurbishing other instrumentation.

Expansion of Water Treatment Facilities, Phase 2

New Water Treatment Facilities will be constructed with wastewater handing capacity of 3,000 gpm plus standby capacity of 1,000 gpm.  A new switchgear house building will be constructed in compliance with the security and safety directive (SSD) regulation a water treatment facilities.

Installation of Security Monitoring System

This system includes:

  • Security perimeter fence a accordance with SSD-1
  • A New security lighting
  • A new reinforce concrete security control center in accordance with SSD-26
  • Fence intruder Detection & Assessment System (IDAS) which will be an integrated system comprised of Closed Circuit Television System (CCTC)
  • Fiber Optic Sensor System
  • Video Motion Detection and a Micro Wave Detection System.

RE-Construction of Business & Community Districts

The new facilities to replace existing KJO facilities are:

  • Office park
  • Material Warehouses and Maintenance Workshops
  • Integrated Laboratory
  • 536 New Company family houses
  • Sport ad Recreation facilities
  • Bachelor quarters
  • Independent Offices
  • In-Campus and out-Campus schools

AGOC Home Ownership

Home ownership is a major Program
Land lot area is 1.5 sq. km. (1km X 1.5km) at Al- Khafji

The Program involved design, Tender, Construction and commissioning of Infrastructure and other Community Support Facilities

850 Land lots with a total area of 1.5 sq. kms (1 km. X 1.5Km.)

Community Support Facilities

  • Seven (7) schools
  • Shopping Center, including a Bank and Post Office
  • Fitness Center
  • Clinic
  • Police Station
  • Fire Station
  • Offices

Future Industrial Project

Onshore Projects:

  • Renovation of Loading Facilities
  • Crude Pre-setting Facilities
  • Replacement of Khafji and Ratawi Pita

Offshore Project:

  • Installation of New Flow Station
  • Installation of Integrated Well Jackets 2 & 3
  • Installation of New Crude Transmission Line
  • Installation of WDACS
  • Installation of MPFM on Well jackets

Utilities Projects

  • Construction of Sea Water Desalination Unit
  • Installation of Distillation Unit
  • Construction of Fresh Water Tank